Products & Applications

Our experts will work with you to find the right bridge for every requirement profile. In most cases, one of two types of bridges is used: the Medium-sized Mobile Bridge (MMB) or the Heavy-duty Mobile Bridge (SMB).

Regardless of the trade, GDELS bridges can be used in various ways.

Presentation of Bridge Solutions
Medium-sized Mobile Bridge (MMB) or the Heavy-duty Mobile Bridge (SMB)

The maximum load can be up to 130 tons, and depending on the span of the bridge and the axle loads and distances of the translating vehicles even higher lifting capacities can be realized! Normal construction site and road traffic (40-ton trucks) is possible on every bridge and every free span without problem. In the case of special or heavy-duty transports, the bridge statics are calculated and verified individually.

A closed carriageway is standard for both types of bridges. The center cover between the lanes can be opened for special applications (e.g., earth drilling). Construction-site railings that can be quickly dismantled are available as railing options, as well as Eurocode railings for use as pedestrian and cycle bridges in public areas. The railing system also provides a prominent advertising space – an optimal place for your company logo or advertising message. Please feel free to contact us if you are interested.

Our experts will work with you to find the right bridge for every requirement profile.

With our prefabricated bridge systems, we offer certified and safe alternatives for temporarily bridging bodies of water, ditches and other obstacles – optionally as a rental or purchase solution and regardless of whether for a single crossing or layover period of several weeks, months, or even years.

Fields of Application with References / Case Studies

Regardless of the trade, GDELS bridges can be used in various ways.

Fly-Over Solution

Fly-Over Case Studies

The so-called fly-over is always used when heavy loads are to be moved over existing bridges that have too low or unclear load-bearing capacity due to their design or condition. The mobile bridge is placed on the existing roadway and thus enables a safe crossing.

Infrastructure construction: Track construction project
- Medium-sized Mobile Bridge - Over existing bridge
Fly-Over
Overhead line construction: Mast renovation
2x SMB and 1x MMB in series with construction-site railing Over elevated existing bridge. Assembly and dismantling were carried out by excavators and telescopic forklifts, as there was not enough space for a truck-mounted crane.
Fly-Over
Renewable energies: Transformer transport for substation
Heavy-duty Mobile Bridge without railing (single crossing under full closure) Over existing bridge. Assembly and dismantling were carried out by excavators and telescopic forklifts, as there was not enough space for a truck-mounted crane. Despite its low ground clearance, the low-bed trailer was able to drive over the bridge without any problems.
Fly-Over

New Transition

New Transition Case Studies

If there is no bridge at all or long bypasses would be necessary, mobile systems create a temporary access route, for example, after disasters or when working in nature reserves.

Overhead line construction: Mast renovation
Medium-sized Mobile Bridge with construction-site railing Temporary support construction over body of water
New Transition
Overhead line construction: Mast renovation
Medium-sized Mobile Bridge with construction-site railing Temporary support construction over body of water
New Transition
Overhead line construction: Mast renovation during renovation of existing bridge
Heavy-duty Mobile Bridge with construction-site railing Temporary support construction over body of water
New Transition
Disaster relief: Replacement bridge in the Ahr valley
Heavy-duty Mobile Bridge with construction-site railing Temporary water crossing after a lead time of three days from the first contact
New Transition
Overhead line construction: Mast renovation
Heavy-duty Mobile Bridge with construction-site railing Transition over body of water. Assembly and dismantling was carried out by means of a truck loading crane.
New Transition
Overhead line construction: Mast renovation
Heavy-duty Mobile Bridge with construction-site railing Transition over dry ditch, transport of another complete SMB on a standard semi-trailer over the bridge
New Transition

Parallel Transition

Parallel Transition Case Studies

During bridge renovations, bypass solutions may be required to maintain pedestrian or vehicle traffic for the duration of the work.

Renovation of existing bridge in public transport
Medium-sized Mobile Bridge with Eurocode railing Transition over dry ditch
Parallel Transition
Renovation of existing bridge in public transport
Heavy-duty Mobile Bridge with Eurocode railing Transition over body of water
Prallel Transition
Our experts will work with you to find the right bridge for every requirement profile.

With our prefabricated bridge systems, we offer certified and safe alternatives for temporarily bridging bodies of water, ditches and other obstacles – optionally as a rental or purchase solution and regardless of whether for a single crossing or layover period of several weeks, months, or even years.

Advertising Options

The railing system offers exposed advertising space – ideal for placing your company logo or a targeted advertising message. If you are interested, please do not hesitate to contact us for further information.

Cookies & Privacy

We use cookies to ensure the technical functionality of our website and to improve it based on anonymized usage data.
Your consent may be withdrawn at any time. Comprehensive information is provided in our Privacy Notice.